New HAAY realization: PLUGG and DOTT GU10
HAAY Products:
PLUGG und DOTT GU10 white
Project:
Practice for General Medicine Köln-Deutz
Builder:
Dr. med. Matthias Lohr (www.doktor-lohr.de)
Planning and execution:
Electrical engineering André Lansen, Köln Vogelsang
Construction management:
André Lansen
Review:
The installation of the PLUGG system is very simple with every ceiling thicknesses and the leveling is done without much trouble.
The HAAY system was favored by the builder because, in the course of the conversion and finishing of the practice all possibilities remain.
Since, in the planning and execution phase, not all the details of the decoration, such as, for example, murals, were clarified, we are very flexible with the HAAY system now used.
Surely in the next time still inserts are exchanged for special areas something with light “Tickle” them.
And we can do this without any installation effort.
I am looking forward to the further ideas of HAAY!
German
HAAY Produkte:
PLUGG und DOTT GU10 weiß
Projekt:
Praxis für Allgemeinmedizin Köln- Deutz
Bauherr:
Dr. med. Matthias Lohr
Planung und Ausführung:
Elektrotechnik André Lansen, Köln Vogelsang
Bauleitung:
André Lansen
Kundenmeinung:
Der Einbau des PLUG Systems ist sehr einfach. Die Höhenverstellung der Montageflügel lässt nahezu alle Deckenstärken zu und das beispachteln erfolgt ohne große Mühe. Das HAAY System wurde vom Bauherren favorisiert weil ihm im Zuge der Um- und Fertiggestaltung der Praxis alle Möglichkeiten bleiben. Da in der Planungs- und Ausführungsphase noch nicht alle Details der Dekoration, wie z.B. Wandbilder, geklärt waren, sind wir mit dem nun verwendeten HAAY System sehr flexibel.
Sicherlich werden in der nächsten Zeit noch Einsätze ausgetauscht um spezielle Bereiche etwas mit Licht zu”kitzeln”.
Und das können wir ohne jeglichen Montageaufwand realisieren. Ich freue mich schon auf die weiteren Ideen von HAAY.
André Lansen